The Onyx estimating and scheduling team can provide cost and schedule tracking of each project on specific time frames, and are capable of developing estimates through the construction phase of the project.
Our estimating and scheduling services include the following:
- Feasibility study estimates (+/- 50% accuracy)
- Equipment factored estimates
- Budget estimates (+/-30% accuracy)
- Detailed estimates (+/-10% accuracy)
- EPC project milestone schedules
- Master schedule development
- Project cost and schedule tracking and reporting
3 /
6
Welcome to Onyx Engineering, Inc.
Estimating & Scheduling